Find help with essential safety measures inspections for Melbourne properties.

Essential safety measures in Box Hill 3128

ESM inspections and annual reports for Box Hill's new apartment towers, offices and older shops in the City of Whitehorse, postcode 3128.

Box Hill’s housing changed quickly between the 2016 and 2021 Censuses, with apartment buildings going up beside older shops and houses. That leaves a split workload for essential safety measures: new buildings with fresh maintenance schedules, and older commercial buildings whose paperwork may be thin. Whitehorse City Council’s municipal building surveyor covers the suburb.

How much Box Hill has grown

The City of Whitehorse community profile, prepared by .id from Census data, defines Box Hill as bounded by Thames Street and Margaret Street to the north, Middleborough Road to the east, Canterbury Road to the south and Elgar Road to the west. Its dwelling mix moved quickly between the last two Censuses:

Dwelling type 2016 2021
High density 1,629 (30.9%) 3,991 (51.4%)
Medium density 2,088 (39.6%) 2,313 (29.8%)
Separate houses 1,520 (28.8%) 1,446 (18.6%)

That is 2,362 more high-density dwellings in five years, in a municipality where 62.0% of dwellings were still separate houses in 2021. The figures are on the Whitehorse dwelling type profile for Box Hill.

New towers: get the first year right

A new Class 2 apartment building or office tower comes with an occupancy permit that lists its essential safety measures and the maintenance each needs. The first annual report is due within the 28 days before the anniversary of that first occupancy permit, so the date is fixed from handover. The early problems in a new building tend to be about paperwork and handover:

  • the developer’s contractors leave and the owners corporation has no service agreements in place
  • the maintenance schedule sits in a handover folder nobody has opened
  • no current occupancy permit is on display, although the BPC requires one in every Class 9 building and in any Class 2 to 8 building constructed or altered after 1 July 1994
  • defects from the builder’s period are mixed up with maintenance faults

An early annual inspection and AESMR visit, booked well before the anniversary, gives the new committee a clean starting point and a log book that matches the building.

Older shops and offices

Older commercial buildings that predate 1 July 1994 follow the 13 June reporting date for measures required under the old rules. Fit-outs can add measures to these buildings, and any change of use brings new requirements under regulation 229. An ESM audit and maintenance schedule is the way to get one reliable list for a building like this.

Typical Box Hill jobs

Building Usual focus
New apartment tower Fire doors on every level, stair pressurisation, sprinklers and hydrants, exit lighting, resident education
Office building Detection panel tests, exit lighting, path of travel checks after tenant fit-outs
Shop or restaurant Exit signs, emergency lights, extinguishers, clear rear exits
Mixed-use podium Two sets of occupiers sharing exits, so egress checks and clear responsibilities matter

For apartment towers, our fire door inspection page explains the annual check. For shops and offices, see emergency and exit lighting testing.

Checking providers in the east

Fire protection plumbers who service hydrants, sprinklers and hose reels hold a BPC registration or licence in the fire protection class. Electricians who repair emergency lighting must work for a Registered Electrical Contractor and appear on Energy Safe Victoria’s registers. Building surveyors who prepare maintenance schedules are registered with the BPC. The about page lists the registers.

What it costs

Box Hill has no separate published price list. Melbourne-wide published ranges put a small commercial building’s annual report at $200 to $450 per report plus GST, and a detection or fire indicator panel test at $150 to $600 per visit. The Melbourne ESM cost guide covers the rest.

Next step

Make a Box Hill enquiry with the address, building type, number of levels, and the occupancy permit date if the building is new. The independent provider who takes the job confirms scope, access and price with you directly.

Send a job enquiry

Frequently asked questions

Our Box Hill building is new. When is the first annual report due?

Within the 28 days before the anniversary of the first occupancy permit that required an essential safety measure. Check the date on the occupancy permit and diarise it.

The developer's contractors have left. Who services the measures now?

The owners corporation needs to engage its own contractors. Use the maintenance schedule from the occupancy permit as the scope, and ask the developer or building manager to hand over the records so far.

Does Whitehorse Council inspect ESM records?

The municipal building surveyor can ask to see annual reports and maintenance records, and the fire authority's chief officer can too. Records must be available at the building within 24 hours of a request.

Does a house in Box Hill need essential safety measures inspections?

No. The essential safety measures system applies to buildings other than houses and outbuildings.