ESM audits, maintenance schedules and log book setup

Find out which essential safety measures a Melbourne building has, get a compliant maintenance schedule, and set up a log book that stands up to an audit.

An ESM audit works out which essential safety measures a building is required to have and how each one must be maintained. It comes first when the occupancy permit is lost, the building predates 1 July 1994, or reports were signed from an old list. It leads to a maintenance schedule and a log book.

Illustrative photo for ESM audits, maintenance schedules and log book setup

Signs your building needs an audit

  • Nobody can find the occupancy permit or the maintenance schedule that came with it.
  • The building was built before 1 July 1994 and has never had its measures listed.
  • The annual report is signed every year from a list that does not match what is on the walls.
  • Fit-outs, new tenancies or a change of use have added doors, signs or detectors that were never added to the schedule.
  • A council or fire authority inspector has asked for records the owner cannot produce.
  • Service contractors have changed and the log book stopped, or each contractor kept their own records.

Each of these leaves the owner unable to say with confidence that every measure was inspected, tested and maintained, which is what the annual report asks them to declare.

What the regulations allow

The Building Regulations 2018 give owners a set path. Under regulation 219 an owner may ask the municipal building surveyor or a private building surveyor to prepare a maintenance schedule, and must hand over the essential safety measure documents the owner holds. Regulation 220 lets the surveyor prepare it, and regulation 221 requires a copy to go to the owner without delay.

Regulation 222 sets what the schedule contains. For a building constructed before 1 July 1994 it lists every measure required under the law of the day, plus anything required later by an occupancy permit or maintenance determination. For each measure it records the level of performance needed and the frequency and type of inspection, testing and maintenance. Measures are listed in date order of when each became required, and the schedule must use the form the BPC approves.

The full text is in the Building Regulations 2018 on the Victorian legislation site, Part 15.

Audit options compared

Option Who does it What you get Suits
Desktop review ESM contractor or consultant A list built from permits, plans and past reports, with gaps flagged Buildings with a full paper trail
Walk-through audit ESM contractor Each measure found, located and condition-checked against the list Most apartment blocks and commercial buildings
Maintenance schedule from a building surveyor Municipal or private building surveyor registered with the BPC A schedule prepared under regulation 220 in the approved form Pre-1994 buildings, missing permits, buildings altered without updated paperwork
Combined Contractor audit, then surveyor schedule Site evidence plus a legally prepared schedule Older buildings with many changes

Only a building surveyor can prepare the schedule itself under the regulations. A contractor’s audit is useful evidence for the surveyor and for the owner, but it is not a substitute.

Documents a provider will ask for

  1. The occupancy permit and any maintenance schedule or maintenance determination.
  2. Building permits for fit-outs or alterations since the original permit.
  3. Past annual essential safety measures reports and log books.
  4. Service reports and tags from fire protection, electrical and mechanical contractors.
  5. Floor plans showing exits, fire doors, fire compartments and services.

If the permits are missing, the council that covers the address can usually supply copies of approved building permits and occupancy permits. The City of Monash, for example, points owners to its building plans request service for exactly this purpose on its essential safety measures page.

Setting up the log book

A log book is where the year’s evidence lives. Regulation 225 lists the records an owner must be able to produce at the building, at a day’s notice, when the council’s building surveyor or the fire brigade’s chief officer asks: annual reports from the past 10 years, maintenance schedules, maintenance determinations, and records of every inspection, test and repair. A workable log book has:

  • the current maintenance schedule at the front
  • one section per measure, in schedule order
  • service reports and certificates filed under the measure they relate to
  • a defects register showing each fault, the date found and the date fixed
  • the signed annual reports, newest first

Keep it at the building, or keep a current copy there. Electronic records are common, but someone on site must be able to produce them on request.

When the work changes the building

The BPC warns that alterations can affect essential safety measures and suggests checking with a municipal or private building surveyor first. A change of use is also caught by regulation 229, which requires the building to comply with the regulations that apply to the new use unless the municipal building surveyor grants an exemption. An audit after a fit-out is the point where new exit signs, extra fire doors or relocated detectors get added to the schedule.

Licence and registration checks

Building surveyors must be registered with the BPC. Use the BPC find and check a practitioner tool to confirm the surveyor’s registration, its class and any conditions before you sign an engagement. Fire protection plumbers and electricians who service measures hold their own registrations, covered on the about page.

Cost

Audits and schedules are priced per building because the work depends on its size, age and paperwork. No published Melbourne price exists that we could verify, so none is quoted here. The Melbourne ESM cost guide shows the published ranges for the annual report and routine servicing that follow an audit.

What to do next

Request an ESM audit through the enquiry form with the building’s address, class if known, age, and a list of the documents you hold. Independent auditors and building surveyors decide whether they can take the job and set their own fees. Once the schedule is in place, the routine work is covered in our guides to annual inspections and the AESMR and exit and path of travel inspections.

Send a job enquiry

Frequently asked questions

What is the difference between an audit and a maintenance schedule?

An audit is an investigation of what the building has and what state it is in. A maintenance schedule is the formal list, prepared by a municipal or private building surveyor in the approved form, setting the performance level and maintenance for each measure.

My building was built in the 1970s. Does it have a maintenance schedule?

Often not. Buildings from before 1 July 1994 frequently have no written schedule, although the measures required at the time still had to be maintained. An owner can apply to a building surveyor to have one prepared.

How long does an ESM audit take?

It depends on the size of the building, the number of tenancies and how complete the records are. A small shop may take one visit; a large mixed-use building may need several visits plus time to search council permit files.

Will the audit find problems that cost money to fix?

It may. An audit can uncover missing exit signs, non-compliant doors or measures nobody has serviced. Knowing about them lets you plan repairs and budget, which is better than finding them during an inspection by council or the fire authority.

Should the log book be paper or electronic?

Either can work. What matters is that the records are complete, organised by measure and can be produced at the building within 24 hours of a request from the municipal building surveyor or the fire authority's chief officer.